All paint systems shall be applied in accordance with manufacturer instructions and Australian Standard AS/NZS 2311:2017 *Guide to the Painting of Buildings*.
| Surface | Type | System |
|---|---|---|
| Ceiling | Flat acrylic ceiling white | 1 x sealer/undercoat 2 x top coats |
| Walls | Low-sheen or washable matt acrylic (moisture and mould resistant) | 1 x primer/sealer 2 x top coats |
1. All circuits shall be insulation resistance tested prior to connection.
2. All fittings must be tested for correct polarity, earth continuity, and RCD function.
3. All lighting and appliances shall be tested for correct operation.
4. Certificate of Electrical Safety shall be provided to the client or builder on completion.
1. The electrician shall liaise with the builder or site supervisor to confirm locations of all switches, lights, fans, and outlets.
2. Electrician shall ensure rough-in is complete prior to wall sheeting or tiling works.
3. Fit-off shall be coordinated after cabinetry, tiling, and painting works are complete.
4. Site must be kept tidy, and all debris and packaging removed at the end of works.
1. Works outside the defined bathroom renovation area unless explicitly stated.
2. Installation of smart home systems, AV equipment, or non-standard data wiring.
3. Provision of fixtures unless specifically nominated.
4. Alterations to switchboard unless triggered by compliance upgrades.