All tiles and related materials shall be installed as per the client’s approved selections and layout drawings. Layout must be confirmed with the client or site supervisor prior to commencement.
| Area | Tile Description / Size | Grout Colour | Supplied By (Client / Tiler) |
|---|---|---|---|
| Floor | [Insert] | [Insert] | [Insert] |
| Shower Walls | [Insert] | [Insert] | [Insert] |
| Main Walls | [Insert] | [Insert] | [Insert] |
| Niche / Feature Wall | [Insert] | [Insert] | [Insert] |
Substrates must be free of dust, oil, and contaminants prior to adhesive application.
1. Primer must be applied to porous substrates before adhesive.
2. All edges and junctions to be sealed with flexible silicone (colour to match grout or as directed).
3. Tile edges at external corners to be finished with trims unless otherwise agreed.
4. Waste covers to be installed flush and aligned with tile layout.
1. Tiler shall coordinate with builder and other trades to confirm timing of substrate readiness, waterproofing, and fixture installation.
2. All rough-ins and waterproofing must be complete and signed off prior to commencing tiling.
3. Final tile cleaning must be completed prior to fit-off of plumbing fixtures.
4. Work to be completed within agreed timeframe: [Insert Date Range].
1. Supply of tiles unless specified.
2. Repairs to existing substrate unless agreed.
3. Waterproofing works (to be completed by licensed waterproofer).
4. Tiling to areas outside the defined bathroom scope unless stated.